
Green Field Expressway: The first toll (Mahura Kala) of Agra Lucknow Expressway is preparing to connect the first toll of Purvanchal Expressway directly. The Green Field Expressway project connecting it has been approved.
Project length
)
Service road will be built on both sides of the length of this project in 7 meters width. Advanced Traffic Management System (ATMS) will be installed under the proposal of Eupida. It may take at least 3 years to build the land acquisition process and link expressway.
What will be made here?
)
This will make the movement on the expressway easier. The vehicles will fill without brakes. 2 big bridge, 20 small bridge, 2 railway overbridges, 6 flyovers and 5 interchanges will be made on the expressway. Now people going from Lucknow to Kanpur will connect directly to Purvanchal Expressway.
Land acquisition
)
The Yogi government has given the green signal to the Green Field Expressway. It will be of 6 lanes and 8 lanes will also be done with rising traffic in future. 597 hectares of land from 39 villages will be acquired for this project.
Who will benefit?
)
After the expressway is built, it will maintain it for 5 years. Its length will be around 49.960 meters. The most benefit of this is going to be available to Lucknow, Agra, Kanpur, Prayagraj, Varanasi and Ghazipur.
Where will the Expressway pass?
)
The expressway will pass through villages like Adampur, Ikhara, Sakbhavai, Luhas Banthara, Sikandpur, Kuraini, Bhagdumpur, Kashi Jaitikheda, Parwar, West Parvar, Udkheda, Khujha, Barkat Nagar, Kithuli and Kalphas in Lucknow.
Travel will be easy
)
Here the speed of vehicles will be 120km per hour. If those traveling here will have to catch Purvanchal Expressway, then they will not have to go to Lucknow Kanpur Expressway and walk on Lucknow-Kanpur (NH-27) i.e. the expressway below.
look news india