Thursday , January 9 2025

210 KM long new expressway will pass through many districts of UP, the pace of development will increase

224aa40b4454b6f0cb744e78c104d86f

The traveler passing through Saharanpur has brought a new hope in the western part of Uttar Pradesh. Delhi-Dehradun Expressway. This will not only provide excellent transportation facilities but will also take the economic and social development of the area to new heights.

Travel from Delhi to Dehradun will be easy and fast

This 210 kilometer long expressway will greatly reduce the distance between Delhi and Dehradun.

  • Current time:
    It’s almost time to reach Dehradun from Delhi. six and a half hours It takes time.
  • Future time:
    After the completion of this expressway, this journey will only two and a half to three hours Can be completed in.

this expressway Baghpat, Shamli and Saharanpur Like it will pass through big districts. This will not only save time for passengers, but will also ease the movement of goods and trade.

Expressway will be 10-12 lanes wide

The design of this expressway is very modern.

  • Width:
    It will be 10-12 lanes wide and at some places its width 130 meters Will be till.
  • Security and Facilities:
    every 25-30 kilometers Rest stops and modern safety equipment will be installed.

Construction taking place in four phases

Delhi-Dehradun Expressway is being constructed in four phases.

  1. First Step:
    • Length: 32 kilometers.
    • Area: It connects Delhi’s Akshardham temple with Baghpat.
    • Situation: has been completed.
  2. Second step:
    • Length: 118 kilometers.
    • Area: From Baghpat to Saharanpur.
    • Situation: Most parts have been opened for traffic.
  3. third step:
    From Saharanpur to Roorkee.
  4. Fourth step:
    It will end with the construction of the tunnel near Rajaji National Park in Dehradun.

construction of smart buildings and structures

This expressway is not just a road; It is an excellent example of modern engineering.

  • Underpasses and Overbridges:
    110 underpasses, 5 railway overbridges and 4 major bridges are being built.
  • Tunnel Construction:
    To protect the environment in Rajaji National Park 340 meter long and 12 kilometer tunnel Has been created.

Toll system: What will be new?

Toll will be charged according to distance on Delhi-Dehradun Expressway.

  • First 18 Kms (Akshardham to Loni):
    this part completely toll-free Will remain.
  • Promotion of tourism and trade:
    The expressway will give a new dimension to tourism and trade between Uttarakhand and Delhi.

There will be a boost in economic activities

This expressway will not only facilitate faster traffic, but will also increase the prices of land in the surrounding areas.

  • Infrastructure improvements:
    Due to better connectivity, industry and trade will get a boost in the area.
  • Investment Opportunities:
    The increasing demand for lands will bring new opportunities for investors and local people.

Amazing synergy of environment and progress

The Delhi-Dehradun Expressway has been designed keeping in mind environmental protection.

  • Security of Rajaji National Park:
    A special tunnel has been built to ensure the safety of animals.
  • Green Corridor:
    Green corridor will also be prepared along with the expressway.

New opportunities for local people

  • Employment Opportunities:
    Local people will get employment in construction and maintenance related works.
  • Economic Progress:
    There will be a big improvement in the local economy due to the expressway.