Saturday , November 23 2024

Mumbai's first underground metro line launched for common people, know all the information including route fare | News India


7 Under G

Monday is a very special day for the people of Mumbai, because the first underground metro train service has started between BKC and Aarey from 7 October 2024. The service is available on Mumbai Metro Line 3, which was inaugurated by Prime Minister Narendra Modi. The metro administration has also introduced MetroConnect3 app for this service. Let us tell you that there are a total of 10 metro stations between BKC and Aire. There will be 96 metro train journeys every day on this. People will get many facilities on this route. Their journey will be easier and time will also be saved.

These stations on the route

The metro line also connects Terminals 1 and 2 of Chhatrapati Shivaji Maharaj International Airport and connects to Ghatkopar-Andheri-Versova Metro Line 1 at Marol Naka station. Talking about the ten stations on the route, Mumbai Metro Line 3 corridor is between BKC, Bandra Colony, Santa Cruz, Chhatrapati Shivaji Maharaj International Airport (CSMIA) T1, Sahar Road, Chhatrapati Shivaji Maharaj International Airport (CSMIA) T2, Marol Naka. Andheri. , SEEPZ, Aire Colony is JVLR metro station.

how much is the rent

The minimum ticket price between Mumbai Metro Line 3 corridors is Rs 10 and maximum Rs 50. Let us tell you that the timing of the first metro on this route is 6.30 am and the timing of the last train is 10:30 pm. Note that on Sunday, metro train services will be available two hours later than usual. That means on this day the first train will leave at 8:30 in the morning. The average time between arrival and departure of two trains is 3-4 minutes.

Only 12.44 kilometer road is being opened

Mumbai Metro Line 3 is 33.5 km long underground. At present only a stretch of 12.44 kilometers will be opened to the public. The cost of this project is estimated to be more than Rs 32,000 crore. Each metro train has a capacity of more than 2,000 people. The maximum speed of the train is 85 kmph and it runs at an average speed of 35 kmph. Tickets can be purchased from the app or station counter. By next month, the National Common Mobility Card can be used on all the metro lines of the city. The metro line is expected to be fully operational by June 2025.