Moradabad, March 16 (HS). Sudhir Singh, Senior Divisional Commercial Manager Coaching in Moradabad Railway Division of Northern Railway, said that as per the previous order, development work, repair/non-interlocking work was to be done from March 15 to March 21 at Todarpur station in Alamnagar-Shahjahanpur railway section of Moradabad Division. As a result many trains were being affected.
Senior DCM further said that in view of the festival of Holi, the railway administration has postponed the work of non-interlocking at Todarpur station, keeping in mind the passenger facilities. As a result, all trains will run as per their pre-determined time table. Train number 04319/20 (Lucknow- Shahjahanpur-Lucknow) will also be operated as per the scheduled time table.